The installation of asphalt roads need to have a strong and durable base or else this could contribute to its low life span and risk for cracks and damages. This is a huge financial investment and the contractor should be able to give quality materials and procedures for paving the surface. It consists of a lot of steps which includes the removal of old structure and then applying the new one.

As what is mentioned, the base should be at its strongest which contributes to how good and quality the whole installation or structure could be. Asphalt paving Los Angeles would not work if the sub base is soft and already have initial cracks. That is why there is a need to get this initially done before the rest is applied.

The initial setting would consist of the sub base to be prepared by digging out one foot of ground. There should also be removal of any unwanted soil that is soft, loam, or stumps. This should be done every time there is a procedure for this and not just placing it over on old concrete or cement since the sub base is undetermined.

The next step would be base and grading where the proper installation of materials beneath the asphalt should be placed. This determines the overall foundation of the pavement and also with its durability. Place about four inches to six inches of crushed concrete or asphalt millings.

The millings and crushed concrete are engineered for them to be used on these types of installation. Usually, a skidrow is used to spread these materials and make it evened out. Use a laser level or a transit in order to determine the water flow of the surface. With a vibratory roller, even it out every three or two inches until the desired thickness is there.

It depends on the contractor if they want to add two layers or just one to the pavement. Although usually it is two when it comes to parking lots and then only just one for driveways. Also, the mixture should be delivered fresh and still hot when it is applied on the surface.

This is also called a lift, and what the first one does is that it stabilizes the base course and this consists of large stones with greater hardness. In the second lift or layer, the stones here are smaller and finer. This makes the top layer to be smoother and gives a clean and finished look.

Lastly, you need to have this compacted for the surface to hold itself together. What is needed for this procedure is a vibratory drum roller to make the surface stronger and to smoothly finish it. The edges should have a slope of forty five degrees which is enough angles to support vehicle movement and weight.

The diamond cut should always be maintained in the edges. This is in order for the surface to meet flush in the underground. A way to make sure of the cut is to skim coat the edges in a very thin way. This makes snowplows to lift those up but would still be too thin for it to handle the weight.